Schembecker, G.
Gerhard Schembecker is Professor for Plant and Process Design at the Department of Biochemical and Chemical Engineering of TU Dortmund University. He holds a PhD in chemical engineering from the same university. As co-founder of the consultancy firm Process Design Center, he worked in more than 100 industrial design projects for the chemical industry. In 2005, he was appointed Professor for Plant and Process Design at the Department of Biochemical and Chemical Engineering of TU Dortmund University. His research interests focus on the conceptual design and simulation of (bio)chemical processes with special interest in innovative downstream processes and on module-based plant design.
- ... 0 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Aether Fuels and FlyORO sign MoU to explore integrated SAF supply-chain and blending solutions for Project Beacon and future Aether projects 5/12
- Hapag-Lloyd and Kuehne+Nagel to collaborate on lowering emissions in shipping via sustainable marine fuels 5/12
- Jordan commits $1 B to launch first green ammonia export hub in Aqaba 5/12
- Cognite introduces fully integrated, AI-native industrial experience 5/12
- Hengli Petrochemical's former Singapore unit to cease operations 5/12
- Mitsubishi Chemical to withdraw from polybutylene succinate business at PTT MCC Biochem 5/12
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

