Zardynezhad, S.
Shahab Zardynezhad, PMP, is a registered Senior Mechanical Equipment Engineer in Alberta. He has 24 yr of experience working on many of the world’s largest oil, gas and petrochemical projects. His areas of specialization and industrial experience include engineering, design, procurement, inspection, installation, startup, maintenance, troubleshooting of general and special-purpose rotating equipment, with special concern on project management subjects and “fitness-for-purpose” consideration. He holds a BS degree in mechanical engineering from the University of Petroleum, an MS degree in industrial engineering from I.U.S.T, and a MEng degree in project management from the University of Calgary.
Perform field oil flushing for successful centrifugal gas compressor startup
Many factors are necessary for a successful compressor startup. One of the key actions is conducting high-quality field oil flushing during the precommissioning stage, or after a major overhaul.
Achieve successful compressor startup by addressing dry-gas seal failure
A common root cause for compressor failure during first startup is a failure of the dry-gas seal (DGS) system. To avoid failures of gas compressors, the project team and end users must understand the importance and significance of the DGS very early in the basic design phase.
- 1
- ... 1 pages
- Aether Fuels and FlyORO sign MoU to explore integrated SAF supply-chain and blending solutions for Project Beacon and future Aether projects 5/12
- Hapag-Lloyd and Kuehne+Nagel to collaborate on lowering emissions in shipping via sustainable marine fuels 5/12
- Jordan commits $1 B to launch first green ammonia export hub in Aqaba 5/12
- Cognite introduces fully integrated, AI-native industrial experience 5/12
- Hengli Petrochemical's former Singapore unit to cease operations 5/12
- Mitsubishi Chemical to withdraw from polybutylene succinate business at PTT MCC Biochem 5/12