Kwon, O.
Ohgeon Kwon is a Principal Consultant and Structural Integrity Team Lead at Quest Integrity. Dr. Kwon has more than 25 yr of experience and expertise in high-temperature creep, FFS and remaining life assessments for various components in the petrochemical, refining and power generation industries. He earned his PhD at Imperial College, London.
Case studies: Evaluation of the soundness and remaining life of PSA vessels with weld defects
Multiple defects were found in pressure swing adsorption (PSA) vessels during an outage of one of four PSA process units.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Petrovietnam says supertanker with Iraqi oil arrives at refinery port 6/1
- Russia bans aviation fuel exports until November 30 6/1
- Green Fuels Operating breaks ground on $400-MM refinery in Oklahoma (U.S.) 6/1
- SABIC puts 141 lots of industrial assets up for public auction 6/1
- Digital Exclusive: Margin left on the table: The hidden cost of supply chain capability gaps in hydrocarbon processing—Part 1 6/1
- bp sells 5% stake in Australian Browse LNG project to South Korea's GS Energy 6/1
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

