Cardoso, R.
is a lead process engineer for the Phillips 66 Westlake Refinery. He has 10 years of experience as a process engineer and has worked as a chemical expert for the federal police in Brazil. Mr. Cardoso holds a BS degree in chemical engineering from Rio de Janeiro Federal University in Brazil and an MS degree from the French Institute of Petroleum in France.
Troubleshoot operation of a steam ejector vacuum system
A crude vacuum unit operating properly generates high gasoil yield vs. low-value vacuum residue.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Ineos to shut polystyrene facility in Illinois (U.S.) by the end of the year 6/19
- How ASTM approval of methanol-to-jet accelerates SAF at scale 6/19
- EU crafts plan to give industries extra free CO2 permits this year 6/19
- PetroChina forecasts Chinese oil consumption will drop 4.9% this year 6/19
- Digital Exclusive: Water injection pump mechanical seals failure after pump shutdown 6/19
- Russian gasoline output down 25% so far in June after drone attacks on refineries 6/19
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

