Abdi, M. A.
Choosing the wrong flame arrestor can prevent capacity enhancement
This Iranian gas facility debottlenecked its process and increased production
Improve contaminant control in amine systems
These guidelines illustrate what every process engineer should know about solvent contamination and loss for sour gas processing facilities
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Petrovietnam says supertanker with Iraqi oil arrives at refinery port 6/1
- Russia bans aviation fuel exports until November 30 6/1
- Green Fuels Operating breaks ground on $400-MM refinery in Oklahoma (U.S.) 6/1
- SABIC puts 141 lots of industrial assets up for public auction 6/1
- Digital Exclusive: Margin left on the table: The hidden cost of supply chain capability gaps in hydrocarbon processing—Part 1 6/1
- Fluor JV received limited notice to proceed for proposed Phase 2 expansion of LNG Canada facility 6/1
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

