Al-Mutairi, F.
Faisal Al-Mutairi is a chemical engineer at KNPC’s MAA refinery and works in the Operational Planning division.
Refineries’ pandemic turmoil—KNPC’s gasoline demand: Opportunities and challenges
Environment & Safety
/ Maintenance & Reliability
/ Petrochemicals
/ Process Optimization
/ Refining
/ Aromatics
/ Catalysts
/ Construction
/ Desulfurization
/ Diesel
/ Distillation
/ Economics
/ Engineering & Design
/ Environment
/ Equipment
/ Gasoline
/ Hydrogen
/ Hydrotreating
/ Loss Prevention
/ Management
/ Naphtha
/ Polymers
/ Products
/ Reactors
/ Sulfur
/ Treating
/ Utilities
/ Middle East
The COVID-19 pandemic is regarded as one of the most exceedingly difficult challenges faced in the oil and gas industry's history.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Honeywell collaborates with SAF One and Tata Projects to enable sustainable aviation fuel production 1/29
- Casale and OMNI Sign MoA to jointly advance waste-to-green methanol and hydrogen technologies 1/29
- GIZ and thyssenkrupp nucera partner to advance green hydrogen and power-to-X markets in India 1/29
- IACS issues new Unified Requirement on ammonia release mitigation systems 1/29
- TotalEnergies and Mozambique announce the full restart of the $20-B Mozambique LNG project 1/29
- CF Industries, POET launch low-carbon fertilizer pilot to cut ethanol production carbon intensity 1/29
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

