Y. Ha
Case study: Why did the tube sheet of the waste heat boiler deform?
This article analyzes the causes of a 19-mm protrusion of the tube sheet and the tube joint leaks that occurred within a sulfur recovery unit (SRU) waste heat boiler (WHB).
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- INEOS Inovyn agrees to sell its Italian chlor-alkali business to Esseco Industrial 4/21
- LOTTE Chemical to merge into integrated corporation after spinning off Daesan plant 4/21
- Petronor and H2SITE partner to pioneer high-purity hydrogen production in refining through advanced membrane technology 4/21
- Emerson accelerates edge ecosystem for real-time enterprise operations intelligence 4/21
- Tracerco launches DrumVision™ to deliver real-time process visibility in delayed coking and demanding interface measurement applications 4/21
- IMI signs global framework extension with Solvay for the provision of IIoT sensors 4/21
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

