Whalen, J. K.
PE, is the chief engineer for John Crane. He is a member of STLE, ASME and the Vibration Institute. Mr. Whalen is also a member of the Turbomachinery Symposium Advisory Committee and is a registered professional engineer in the state of Texas. He holds a BS degree in mechanical engineering from the Rochester Institute of Technology. He worked for Dresser Rand, where he was involved in large turbine engineering and rotordynamics. Mr. Whalen joined Centritech Corp. in 1988 and helped form Turbo Components and Engineering in 1991.
Consider new labyrinth seals to optimize compressor operations
Maintenance & Reliability
/ Process Optimization
/ Americas
/ Asia/Pacific
/ Compressors
/ Drivers
/ Engineering & Design
/ Equipment
/ Europe
/ Middle East
/ Motors
/ Rotating Equipment
/ Safety
Degradation of labyrinth seals in centrifugal impellers can have a significant impact on not only compressor power consumption but also on plant production rate. Upgrading to rub-tolerant seals can be..
- 1
- ... 1 pages
Current Digital Edition
![](/media/nkzcuz2h/hp-june-2024-process-optimization.jpg?width=100)
Sign up to Receive Our Newsletter
Latest News
- Essar launches hydrogen power plant at Stanlow refinery (U.K.) 7/16
- Trelleborg partners with Airbus on hydrogen-powered air travel 7/16
- Neste, Mitsubishi Corporation agree on strategic partnership to develop supply chains for renewable chemicals and plastics 7/16
- Vale, Komatsu and Cummins announce collaboration to develop dual-fuel large trucks, powered by ethanol and diesel 7/16
- Mexico–U.S. energy trade value fell in 2023 on lower fuel prices 7/16
- Belarus' Mozyr oil refinery restoring operations after outage due to storm 7/16
- Digital Exclusive: SPECIAL FOCUS: Digital Technologies—Utilize process simulation digital twin to optimize condensate yield
- Digital Exclusive-Flare system design: Liquid pockets in flare headers
- Hydrogen-rich content gasoline: A new concept for paraffinic gasoline reformulation
- Alarm rationalization at Kuwait National Petroleum Company (KNPC) refineries
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction