Majumdar, K.
Requirements for successful cooling water pumping—lessons learned from a major failure
Mechanical design of the pump and system design of the installation are both equally important
Understand centrifugal compressor, equipment interaction
Operating scenarios provide insights into predicting behavior during changes
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Petrovietnam says supertanker with Iraqi oil arrives at refinery port 6/1
- Russia bans aviation fuel exports until November 30 6/1
- Green Fuels Operating breaks ground on $400-MM refinery in Oklahoma (U.S.) 6/1
- SABIC puts 141 lots of industrial assets up for public auction 6/1
- Digital Exclusive: Margin left on the table: The hidden cost of supply chain capability gaps in hydrocarbon processing—Part 1 6/1
- bp sells 5% stake in Australian Browse LNG project to South Korea's GS Energy 6/1
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

