Prather, P.
is a supervising process engineer at WorleyParsons in Houston, Texas. He received a BS degree in chemical engineering from McNeese State University. He is a licensed Engineer-in-Training (E.I.T.) in Louisiana and the company’s representative to the Design Institute for Emergency Relief Systems (DIERS) Users Group.
Design and implement a totally enclosed ground flare
As awareness of environmental issues increases to new levels, all emissions sources in industrial facilities are falling under more scrutiny than ever before.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Petrovietnam says supertanker with Iraqi oil arrives at refinery port 6/1
- Russia bans aviation fuel exports until November 30 6/1
- Green Fuels Operating breaks ground on $400-MM refinery in Oklahoma (U.S.) 6/1
- SABIC puts 141 lots of industrial assets up for public auction 6/1
- bp sells 5% stake in Australian Browse LNG project to South Korea's GS Energy 6/1
- U.S. gasoline market set for fresh test after near-record stock draws 6/1
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

