Oude, J. E.
Jelle Ernst Oude Lenferink is the Director of Process Engineering at Fluor in Amsterdam. With 20 yr of experience, he has been leading conceptual studies, FEED and EPC projects, ranging from refinery projects involving hydrocracker technologies to petrochemicals and renewables projects. He studied chemical engineering at the University of Groningen in the Netherlands, and has completed post-graduate work in process design and development at the University of Twente in the Netherlands.
Steam generator in a hydrocracker high-pressure loop—why not?
Environment & Safety
/ Refining
/ Engineering & Design
/ Furnaces
/ Heat Transfer
/ Hydrocracking
/ Hydrogen
/ Safety
Historically, there has been a perception in the industry that it is not safe to include a steam generator in the high-pressure loop of a hydrocracker.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Aether Fuels and FlyORO sign MoU to explore integrated SAF supply-chain and blending solutions for Project Beacon and future Aether projects 5/12
- Hapag-Lloyd and Kuehne+Nagel to collaborate on lowering emissions in shipping via sustainable marine fuels 5/12
- Jordan commits $1 B to launch first green ammonia export hub in Aqaba 5/12
- Cognite introduces fully integrated, AI-native industrial experience 5/12
- Hengli Petrochemical's former Singapore unit to cease operations 5/12
- Mitsubishi Chemical to withdraw from polybutylene succinate business at PTT MCC Biochem 5/12
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

