Omota, F.
Florin Omota is a Senior Process Engineering Manager at Fluor in Amsterdam. He joined Fluor in 2005, where he is recognized as a subject matter expert in process control. In 2018, he became a Certified Functional Safety Expert by Exida. He also worked as Chief Engineer in an ether glycol and derivatives plant at Chimopar SA in Bucharest, Romania. In 1999, he joined the Chemical Engineering Department at the University of Amsterdam as a researcher in process simulation and reactive distillation. He holds a PhD in catalyst modification, slurry reactor performance improvement and scale-up.
Steam generator in a hydrocracker high-pressure loop—why not?
Environment & Safety
/ Refining
/ Engineering & Design
/ Furnaces
/ Heat Transfer
/ Hydrocracking
/ Hydrogen
/ Safety
Historically, there has been a perception in the industry that it is not safe to include a steam generator in the high-pressure loop of a hydrocracker.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Brazil's Petrobras approves $1.2 billion investment for renewable fuels plant 6/22
- First batch of equipment arrives in Kazakhstan for $7.7-B Atyrau polyethylene project 6/22
- Explosion at Qatar's Ras Laffan LNG complex kills 13, injures 66 6/22
- Asia has plenty of crude oil, but refined fuels remain tight 6/22
- Fire extinguished at Marathon's Galveston Bay Refinery in Texas (U.S.) 6/22
- El Nino, expanding ethanol use squeeze India sugar supply 6/22
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

