van Beurden, I.
The future of HAZOP study software: Break through the clutter
It is no secret that as part of its “CPL 03-00-014–PSM Covered Chemical Facilities National Emphasis Program,” the US Occupational Safety and Health Administration (OSHA) is conducting ..
Adopting global functional safety standards
Potential operational savings justifies the initial investment
Performing safety life cycle analysis helps mitigate process hazards
Using integrity levels and instrumented functions is necessary for safe process design
'Proven-in-use' criteria for safety instrumented systems
Use these guidelines to qualify equipment
Safety integrity level verification - A PFD average calculation is not enough
Architectural constraints must also be considered
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Brazil's Petrobras approves $1.2 billion investment for renewable fuels plant 6/22
- First batch of equipment arrives in Kazakhstan for $7.7-B Atyrau polyethylene project 6/22
- Explosion at Qatar's Ras Laffan LNG complex kills 13, injures 66 6/22
- Asia has plenty of crude oil, but refined fuels remain tight 6/22
- Fire extinguished at Marathon's Galveston Bay Refinery in Texas (U.S.) 6/22
- El Nino, expanding ethanol use squeeze India sugar supply 6/22
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

