van Beurden, I.
The future of HAZOP study software: Break through the clutter
It is no secret that as part of its “CPL 03-00-014–PSM Covered Chemical Facilities National Emphasis Program,” the US Occupational Safety and Health Administration (OSHA) is conducting ..
Adopting global functional safety standards
Potential operational savings justifies the initial investment
Performing safety life cycle analysis helps mitigate process hazards
Using integrity levels and instrumented functions is necessary for safe process design
'Proven-in-use' criteria for safety instrumented systems
Use these guidelines to qualify equipment
Safety integrity level verification - A PFD average calculation is not enough
Architectural constraints must also be considered
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- NAPCOR releases 2024 PET recycling report highlighting system efficiency gains and continued strength of PET circularity 12/12
- OQ courts other partners for petrochemical complex in Oman as SABIC drops out 12/12
- Brazil's BNDES approves $71 MM for carbon storage project 12/12
- Cuba on edge as U.S. seizure of oil tanker puts supply at risk 12/12
- China oil demand to plateau between 2025 and 2030 12/12
- Germany's PCK refinery says no impact from pipeline leak 12/12
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

