Schwarzer, H.-C.
Hans-Christoph Schwarzer is Head of sales for styrene MTPROP catalysts in EMEA. Prior to that, he was Sales Account Manager as well as a Global Expert on catalytic dewaxing. He joined Süd-Chemie/Clariant in March 2005 as a group leader in R&D on various topics, including catalyst development and catalyst application for air purification. Dr. Schwarzer graduated with a diploma in chemical engineering from the University of Karlsruhe and the University of Massachusetts in Lowell. He completed his doctoral thesis at the Technical University of Munich and at the University of Erlangen-Nuremberg.
- ... 0 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Ineos to shut polystyrene facility in Illinois (U.S.) by the end of the year 6/19
- How ASTM approval of methanol-to-jet accelerates SAF at scale 6/19
- EU crafts plan to give industries extra free CO2 permits this year 6/19
- PetroChina forecasts Chinese oil consumption will drop 4.9% this year 6/19
- Digital Exclusive: Water injection pump mechanical seals failure after pump shutdown 6/19
- Russian gasoline output down 25% so far in June after drone attacks on refineries 6/19
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

