Biradar, B.
Babanna Biradaris a Principal Engineer with Bechtel India. He has 30 yr of experience in oil, gas and chemicals, infrastructure, metal and mining front-end engineering and detailed design and is a subject matter expert in fire protection and process safety. He holds an ME degree in mechanical engineering from the University of Roorkee, India (now Indian Institute of Technology, Roorkee). He is a member of the NFPA technical committee “Electrical equipment in chemical atmosphere (EEC-AAA),” which is responsible for NFPA 496, NFPA 497 and NFPA 499 standards.
- ... 0 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Petrovietnam says supertanker with Iraqi oil arrives at refinery port 6/1
- Russia bans aviation fuel exports until November 30 6/1
- Green Fuels Operating breaks ground on $400-MM refinery in Oklahoma (U.S.) 6/1
- SABIC puts 141 lots of industrial assets up for public auction 6/1
- Digital Exclusive: Margin left on the table: The hidden cost of supply chain capability gaps in hydrocarbon processing—Part 1 6/1
- bp sells 5% stake in Australian Browse LNG project to South Korea's GS Energy 6/1
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

