Izadi, M.
At the time of this writing, Mahmood Izadi was a Senior Packaged Equipment Specialist at Bechtel Corp. in Houston, Texas. He has more than 15 yr of experience in the oil, academia and manufacturing sectors. He earned a PhD in mechanical engineering from Clarkson University in Potsdam, New York. He has published articles on fouling mitigation in heat exchangers, power plant optimization and heat exchanger design.
Transient analysis of fired heater coils to estimate safety time
During the operation of process fired heaters, the potential exists for sudden interruption of process flow.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Holland America starts pilot tests using renewable fuels on cruise liner 5/3
- U.S. admin sets path for ethanol aviation fuel subsidies 5/3
- Ryazan refinery (Russia) hit by drone strike 5/3
- Novatek's new Ust-Luga condensate unit set for June testing 5/3
- Thiozen pilot successfully produces zero-emission H2 from sour gas waste streams 5/3
- Mexico's Pemex exported 20,000 bpd of crude, fuel to Cuba in H2 2023 5/3
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction