Environment & Safety Gas Processing/LNG Maintenance & Reliability Petrochemicals Process Control Process Optimization Project Management Refining

Utilities

How do project management practices guide turnaround execution?

Universitat Politècnica de València: Amendola, L.  |  Artacho, M.A.
PMM Institute for Learning: Depool, T.

The complex nature of turnaround maintenance projects leads to the development of various methods of managing plant turnarounds. To discover the strengths and weaknesses of each approach during plant ..

HP Brief

Hydrocarbon Processing Staff: Thinnes, Billy

New fuel standards in the USThe US government recently finalized standards that will increase fuel economy to the equivalent of 54.5 mpg for cars and light-duty trucks by model year 2025. When combine..

HP Innovations: Innovations

Hydrocarbon Processing Staff: Blume, Adrienne

Invensys introduces new technology offeringsSoftware and technology provider Invensys Operations Management recently released a program to help clients modernize and improve the performance of aging c..

Prevent external corrosion of boiler tubes under refractory lining

SABIC Technology Centre: Maity, M.  |  Biramov, K.  |  Al-Zahrani, E.
Eastern Petrochemical Co.: Kareem, M. A.

A leak developed on the water wall for several boiler tubes within five months of the commissioning of a plant boiler. In this case, the boiler tubes were partially covered with a castable refractory ..

HP Innovations: Innovations

Hydrocarbon Processing Staff: Blume, Adrienne

PCHEs boost power from waste heatHeatric recently supplied Echogen Power Systems Inc. with Printed Circuit Heat Exchangers (PCHEs) for Echogen’s Supercritical CO2 (ScCO2) power generation cycle. ..

HP Reliability: Rethink your auditing of lubrication practices

Hydrocarbon Processing Staff: Bloch, Heinz P.

All hydrocarbon processing industry (HPI) facilities use machinery, and every one of these machines requires lubrication of some type. Modern, profitability-minded plants thoughtfully manage their lub..

HP Engineering Case Histories: Case 69: Heat-up rate and rubs on a steam turbine

Consulting Engineer: Sofronas, A.

This column has suggested using simple analytical models to troubleshoot equipment. However, in some cases, a more detailed solution may be required. The following case histories examine the heat up o..

HP Water Management: Avoid failures in water projects: Part 2

MarTech Systems, Inc.: Huchler, L. A.

Last month, we discussed the need for project engineers to talk to process engineers about the water systems as a capital project takes shape. This month’s column discusses additional ways to bri..

HPI major events and trends, 1920s to present

1920s: THE FORMATION OF THE MODERN HPIDuring this period, a new industry was evolving focused on the refining of crude oil into fuels and other products. New demand for crude oil-based products, such ..

HP Innovations: HPInnovations

Vessel monitoring system uses thermal cameras   Fig. 1.  This vessel monitoring software shows the exact   locations of imaging cameras. The Critical Vessel Monitoring System ..