Environment & Safety Gas Processing/LNG Maintenance & Reliability Petrochemicals Process Control Process Optimization Project Management Refining

Safety

HP Reliability: Tutors can provide answers

Hydrocarbon Processing Staff: Bloch, Heinz P.

As you read this column, much additional data on the nuclear disaster on the east coast of Japan’s main island will have become available. But, the terms safety and reliability will still be on o..

HP Construction: Inauguration of the Ras Laffan Olefins Co. (RLOC) Cracker, Qatar

A joint venture between Qapco1 (63.63%), Total Petrochemicals France (36.36%) and QP (Qatar Petroleum)2 (0.01%) was established in June 2002 to implement the Qatofin project. This project includes participation in one of the world’s largest ethane crackers in Ras Laffan, a linear-low-density polyethylene (LLDPE) plant in Mesaiseed and the related ethylene pipeline linking both sites.

Innovation drives new catalyst developments

The Shaw Group: Letzsch, W.

Future challenges in environment and product specifications involve more sophisticated catalyst systems

Global demand for catalysts to exceed $17 billion in 2014

World demand for chemical synthesis, petroleum refining and polymerization catalysts will rise 6%/yr to $17.2 billion in 2014, reflecting a combination of healthy volume and price growth from a weak 2..

Flare stack structure revamp: A case history

Reliance Industries Ltd.: Singh, S.

An innovative approach was used to repair an older flare structure online without an extensive shutdown

Chemical Facility Anti-Terrorism Standard turns four: What’s next?

ADT Advanced Integration: Loughin, R.

An in-depth look at the standard

Process safety: Blind spots and red flags

Mustang Engineering Inc.: Shephard, T.

Improving safety for organizations involve more than technological solutions; understanding processes and plant interactions are a must

HP Reliability: Oil mist and electric motor windings

Hydrocarbon Processing Staff: Bloch, Heinz P.

We often get questions relating to oil mist and how it affects electric motor windings. For a quick answer, contact us at Gulf Publishing via e-mail. We’ll steer you in the right direction by exp..

How would you rate leadership of your capital projects?

Consultant: Patty, R. M.  |  Denton, M. A.

To achieve substantially improved benchmarks in project performance, profound change is needed

What are the ‘magnificent seven’ elements to successfully pick a contractor?

Valuable pointers help industrial plant managers minimize downtime, maintain quality and safety to improve operations