Editorial Comment: Refining overcapacity—will the trend continue?

Hydrocarbon Processing Staff: Nichols, Lee

In September 2015, the Editorial Comment centered on the theme of overcapacity.

Prospective costs of the EPA’s proposed RMP chemical accident prevention requirements

Vinson & Elkins LLP: Wilkinson, G.  |  Pullins, T.  |  Snow, C.

On March 14, 2016, the US Environmental Protection Agency (EPA) published proposed revisions to its Risk Management Plan (RMP) facility safety program in the US Federal Register.

Review of the CSB report on the 2010 Tesoro refinery fire

PetroTech Consultants: McGovern, S. J.

On April 2, 2010, a catastrophic fire occurred within the naphtha hydrotreating unit in the Tesoro refinery in Anacortes, Washington. The final CSB report, including recommendations, was issued in May 2014, more than four years after the incident that resulted in the tragic loss of seven lives. This work critically reviews the CSB analysis of this incident and several of its resulting recommendations.

Design operations-and-maintenance-friendly pressure vessels—Part 2

The Augustus Group: Murti, D. G.

In Part 1 of this article, the assistance provided by standardizations to gain improved vessel performance—vessel outer diameter (OD), component metallurgies, manways and saddles—was discussed.

Improve refinery profitability by processing low-value streams in a diesel hydrotreater

Corporate Research and Development Center, Hindustan Petroleum Corp. Ltd.: Dhar, P. K.  |  Rao, G. S.  |  Bennet, C.  |  Rao, P. V. C.  |  Choudary, N. V.  |  Valavarasu, G.
Visakhapatnam refinery, Hindustan Petroleum Corp. Ltd.: Madhav, G. V.  |  Naidu, A. T.  |  SriGanesh, G.

Global demand for middle distillates, especially diesel, is increasing.

Identify and correct coke drum foundation bolt failures

Suncor Energy Inc.: Tharakan, J.

Coke drums in many operating plants experience foundation bolt failures.

Reduce industrial energy bills through improved combustion control

MOL Group: Galambos, L.  |  Stefán, F.  |  Kovács, I.

The last few years have been an extremely challenging period for the oil industry due to the adverse global economic environment and the impact of unfavorable external factors.

Case study: Plan and execute a coke drum replacement project

Phillips 66: Johnson, B.
Wood Group Mustang: Farris, M.

The delayed coking unit is a critical part of a refinery’s crude oil process flow and profitability.

People

Hydrocarbon Processing Staff: Rhodes, Mike

Honeywell UOP president and CEO Rebecca Liebert has been named by Profiles in Diversity Journal as a winner of its 15th annual Women Worth Watching Awards.

Innovations

Hydrocarbon Processing Staff: Andrew, Bob