Environment & Safety Gas Processing/LNG Maintenance & Reliability Petrochemicals Process Control Process Optimization Project Management Refining

Refining

CITGO celebrates 90th Anniversary of Lemont Refinery

CITGO Petroleum Corp. is capping off the commemoration of the Lemont Refinery's 90th anniversary.

Global Project Data

Hydrocarbon Processing Staff: Nichols, Lee

This special installment of Global Project Data focuses on the global refining sector.

Industry Metrics

Hydrocarbon Processing Staff: Rhodes, Mike

European refining margins rose as refineries completed maintenance and recovered from the negative impact of the France strikes.

Business Trends: Global refining overview—Part 1

Hydrocarbon Processing Staff: Nichols, Lee

The outlook of an industry can change dramatically in a short period of time. This series will examine the global refining sector in depth—where it stands, and where it is going.

Unlock next-level hydrocracker flexibility in today’s turbulent markets

Shell Global Solutions International BV: Baric, J.
Hyundai Oilbank Daesan refinery: Kang, D.-H.
Grupa LOTOS Gdańsk refinery: Orzeszko, G.

As a critical catalytic conversion unit, the hydrocracker provides refiners with valuable feedstock and product slate flexibility.

Viewpoint: The politicalization of the SEC—A dangerous precedent

American Fuel & Petrochemical Manufacturers (AFPM): Thompson, C.

The benefits of fossil fuels are undeniable.

Viewpoint: Improved design practices can aid environment, energy transitions

Axens: Sentenac, J.

During the first months of 2016, perspectives for a stabilizing oil market were being confirmed.

Engineering Case Histories: Case 92: The danger of pneumatic testing complacency

Consulting Engineer: Sofronas, A.

With proper safety, planning and implementation, pneumatic testing of piping and vessels has been performed successfully for many years.

Project Management: Want your plant to work right? Insist on strong project definition

IPA Capital Solutions: Barshop, P.

Project definition is the planning of a project before execution, which begins when engineering is completed, equipment and materials are purchased, and construction of the new or modified plant is performed.

Reliability: Consider amended warranties for rotating equipment

Hydrocarbon Processing Staff: Bloch, Heinz P.

If you have ever encountered a situation where an equipment manufacturer declined to offer warranties, allow us to share three case histories.