Piping
Project Management: Estimate skid and package dimensions
In the absence of vendor quotations or detailed engineering, preliminary dimensions of skids or packages can be estimated quickly using the ratio method.
Fluid Flow: Retrofit for reliability with Coriolis flowmeters
Aging infrastructure has become a much-talked-about issue across the hydrocarbon industry.
Application of ring-type joint gaskets in a refinery
In refineries and petrochemical plants, ring-type joint (RTJ) flanges have been applied to high-pressure processes or sensitive areas that are susceptible to leaks.
Fabrication of clad equipment and piping—Part 2
For pressure vessels, heat exchangers and piping in corrosive services, the materials in contact with the process are often required to be high alloys to provide a reliable service life.
Design considerations for rigging and transportation of large process columns
Design guidelines for rigging and transporting large process columns are outlined in this article, along with the various aspects that should be considered during the initial design phase of equipment.
Set correct design specifications for optimized piping and pipe support system
During the planning and engineering execution of petrochemical, oil and gas, and power projects, it is essential that the owner and engineering, procurement and construction (EPC) contractor mutually develop a comprehensive and detailed piping design specification.
Engineering Case Histories: Case 105—Temperature distribution along a flare line
During an engineer’s career, many interesting questions come up that may not have a ready or good answer.
Stable thermosiphon reboiler operation: With or without a valve in the inlet piping?
A reboiler provides the necessary heat duty for the separation in a distillation tower.
Allocate new plant focus to steam system design—Part 2
Part 1 of this article, which appeared in the January 2019 issue of Hydrocarbon Processing, discussed how new plant construction includes expectations for optimized production performance to achieve targeted profitability.
Fabrication of clad equipment and piping—Part 1
For pressure vessels, heat exchangers and piping in corrosive services, the materials in contact with the process are often required to be high alloys to provide a reliable service life.
- Essar launches hydrogen power plant at Stanlow refinery (U.K.) 7/16
- Trelleborg partners with Airbus on hydrogen-powered air travel 7/16
- Neste, Mitsubishi Corporation agree on strategic partnership to develop supply chains for renewable chemicals and plastics 7/16
- Vale, Komatsu and Cummins announce collaboration to develop dual-fuel large trucks, powered by ethanol and diesel 7/16
- Mexico–U.S. energy trade value fell in 2023 on lower fuel prices 7/16
- Belarus' Mozyr oil refinery restoring operations after outage due to storm 7/16
- Digital Exclusive: SPECIAL FOCUS: Digital Technologies—Utilize process simulation digital twin to optimize condensate yield
- Digital Exclusive-Flare system design: Liquid pockets in flare headers
- Hydrogen-rich content gasoline: A new concept for paraffinic gasoline reformulation
- Alarm rationalization at Kuwait National Petroleum Company (KNPC) refineries