Middle East
Multi-faceted approach on energy efficiency methods
The hydrocarbon processing industry (HPI) is a high-energy-consuming business. After cost for feedstocks, energy is the next largest operating expense for an HPI facility. Since the first oil embargo ..
Shell to build $11B petrochemicals complex in Iraq
Industry Minister Nasser al-Esawi said the Shell complex is expected to start up operations within five to six years and would make Iraq the largest petrochemical producer in the Middle East.
Maximize LPG recovery from fuel gas using a dividing wall column
Refiners are challenged to recover LPG from mixed fuel gas streams due to the difficulty of separating the lighter components from bulk gas. To maintain profitability, it is essential to direct all of the crude oil components to the optimum disposition. This practice is becoming more significant due to increasing LPG demand in some countries and the supply of lighter crudes in countries such as the US.
Shale gas drives new opportunities for US downstream
This shift to lighter feeds for the SC will reduce the future availability of other petrochemical feedstocks—in particular, propylene.
Optimize amine sweetening with an optical O2 analyzer
After extraction, raw natural gas must go through processing before it is suitable for industrial, commercial and residential usage. The first stage of gas processing is known as “sweetening,..
DCS migration: Lessons learned
In 2005, TOTAL’s Port Arthur refinery (PAR), like many present-day refining and petrochemical facilities, found itself with an obsolete, at-capacity distributed control system (DCS). As shown in ..
Avoid counterproductive project management practices
For many years, reliability-focused engineers have observed flawed procurement processes for mechanical equipment. Many requirements are supposedly aimed at the lowest possible lifecycle cost; however..
Use a schedule confidence tool to manage project risk
On most industrial projects, the baseline schedule completion date and the indicated schedule completion date are typically the same, unless the schedule is forcibly re-baselined. Key learnings have indicated that a reevaluation of the scope, schedule and budget is essential.
Fine-tune monitoring of critical compressors
In this case history, a new monitoring system was installed on a critical service hyper compressor for a Middle East (ME) ethylene complex. This unit supported two 400 Mton polyethylene (PE) units; do..
Consider technology to reduce compressor vibration and noise problems
Industrial centrifugal compressors installed in hydrocarbon processing industry (HPI) complexes absorb significant amounts of mechanical power when compressing gases. A small part of the mechanical en..
- ITT to acquire SPX Flow for > $4.77 B, expanding leadership in highly engineered components and adjacent flow technologies 12/5
- MOL Group introduces eco-friendly Bag-in-Box packaging for lubricants 12/5
- Addis Energy secures $8.3 MM to scale its transformative approach to low-cost ammonia production 12/5
- World Fuel Services supplies cruise line with waste-based biofuels 12/5
- Chevron announced $18 B-$19-B CAPEX budget for 2026 12/5
- Russia and India sign deal to build urea plant in Russia 12/5

