Environment & Safety Gas Processing/LNG Maintenance & Reliability Petrochemicals Process Control Process Optimization Project Management Refining

Middle East

Automate furnace controls to improve safety and energy efficiency

Phillips 66: Mickity, D.

Furnace firing is the biggest single operating expense in any refinery. Consider a medium-size refinery (250,000 bpd) that consumes 2,000 MMBtu/h. At a cost of $5/MMBtu, that’s $87.6 MM/yr being ..

Use online conditioning to monitor electric motors

GE Measurement and Control: Wilhelm, B.
GE Global Research Center: Neti, P.

Quality and health assessments of motor insulation are important aspects during the manufacturing, as well as the operation, of electrical motors. Today, there are several offline insulation quality a..

Russian straight-run fuel oil supply collapse complicates Gulf Coast feedstock choices

ESAI Energy: Reed, A.

In the next couple of years, collapsing Russian supply of straight-run fuel oil (SRFO) will undermine foreign supply of feedstock to the US Gulf Coast.

Targeted liquid injection improves shed deck performance

Valero Benicia Refinery: Riley, C.  |  Wicklow, C.
Valero Energy Corp.: Hanson, D.  |  Brown Burns, J.

This case study shows how the installation of an unique piping and lance design achieved targeted liquid injection, quenched vapor hot zones and reduced resid entrainment into the heavy coker gasoil product.

HP Reliability: Normalization of deviance can kill

Hydrocarbon Processing Staff: Bloch, Heinz P.

On January 28, 1986, the space shuttle Challenger (mission STS-51-L) broke apart just 73 seconds after launch. The seven-member crew of the shuttle lived until 3 minutes and 58 seconds after launch, w..

HP Automation Strategies: Working toward a more profitable model-based control technology

ARC Advisory Group: de Leeuw, V.

Last November, the European Union (EU) Autoprofit project held a workshop near Amsterdam for academia, users, and suppliers. The workshop organizers presented the results of the soon-to-be-completed m..

HP Project Management: Better strategies avoid project delays—Part 3

Tecnicas Reunidas: Corrales-Pérez, J.

The first two parts of this series analyzed the root causes of project delays and proposed strategies to avoid schedule overruns. This final part reviews construction planning.Construction planningOne..

HP Petrochemicals: Future vehicle design will need collaboration among HPI and auto manufacturers

Hydrocarbon Processing Staff: DuBose, Ben

The US automotive market is under stress to meet new corporate average fuel economy (CAFE) targets of 50 mpg for 2025 model vehicles. The tighter fuel specifications will bring together automobile man..

HP Water Management: What should cooling tower owners do about legionella?

MarTech Systems, Inc.: Huchler, L. A.

The first awareness of the risks of legionella bacteria in cooling water was the outbreak of Legionellosis at the hotel hosting the Legionnaires’ Convention in Philadelphia, Pennsylvania, in 1976..

HP Engineering Case Histories: Case 79: Integral compressor failures

Consulting Engineer: Sofronas, A.

Recently, the author received information regarding the failure of a large reciprocating compressor. In this example, the pistons for power and compressor cylinders are powered by the same crankshaft...