Environment & Safety Gas Processing/LNG Maintenance & Reliability Petrochemicals Process Control Process Optimization Project Management Refining

Maintenance & Reliability

Strategize preshutdown work to enhance productivity

Indian Oil Corp. Ltd.: Kumar, A.

Adopt these principles from a refinery revamp project

HP Reliability: Repetitive pump seal failures can cause disasters

Hydrocarbon Processing Staff: Bloch, Heinz P.

Release No. 2004-08-I-NM (http://www.csb.gov), issued in October 2005 by the US Chemical Safety and Hazard Investigation Board, addresses an incident at an oil refinery with a history of repeated pump..

Solve liquid-hammer problems

Dalan Farayand Engineering Co.: Salehi, F.

Here are several options

HP Reliability: Grounding-ring technology for variable-frequency drives

HEINZ P. BLOCH, Reliability/ Equipment Editor     Comments? Write:HB@HydrocarbonProcessing.com   Variable-frequency drives (VFDs) provide substantial energy sav..

Iron sulfides-effect on amine plants

Amine Experts Inc.: Sheilan, M.
Sulphur Experts: Spooner, B.

Amine plants treating gas containing H2S will have iron sulfides in the system. Here's where they help and hinder plant operation

HP Reliability: How flawed reward systems cost you dearly

Hydrocarbon Processing Staff: Bloch, Heinz P.

In a US trade journal, someone recently observed that "successful lean implementation needs reliable equipment to prevent disastrous consequences. Together, they increase production capacity, decrease..

HP Reliability: How pump installation must differ from the way pumps were shipped

Hydrocarbon Processing Staff: Bloch, Heinz P.

In general, process pump manufacturers are asked to provide pumps as a "set" or assembled package comprising pump, driver and baseplate (Fig. 1). After ascertaining correct shaft separation to accommo..

Case 54: Is it motor vibration or some other cause?

Consulting Engineer: Sofronas, A.

It's not always the motor causing the vibration

Managing costs and incidents in industrial plant equipment

Technical University of Catalonia: Egusquiza, E.  |  Escaler, X.  |  Gardella, M.
University of Mondragon: Goti, A.

Use this method to allogate limited maintenance resources to the most critical equipment

HP Reliability: More about unreliability, global procurement and you

Hydrocarbon Processing Staff: Bloch, Heinz P.

We quite obviously believe that reading is the key to professional growth and that Mark Twain was right in stating that the man who refuses to read is no different from the illiterate person who canno..