Environment & Safety Gas Processing/LNG Maintenance & Reliability Petrochemicals Process Control Process Optimization Project Management Refining

Heat Transfer

Are you using pinch technology effectively in your daily operations?—Part 1

KBC Process Technology Ltd.: Milosevic, Z.  |  Rudman, A.  |  Brown, R.

Pinch technology is the most rigorous, systematic and best documented methodology for process design.1–3 Nearly all optimization projects for heat recovery are conducted with some form of pinch a..

Investigate power limitations in a large steam turbine

Fluor Canada Ltd.: Ghaisas, N.

An investigation was carried out to rectify power limitations for a steam-turbine driver of a cracked-gas compressor (CGC) in a world-class ethylene plant.DescriptionThe turbine is a nine-stage, impul..

Consider novel CGC and front-end depropanizer system for olefins production

Lamar University: Xu, Q.  |  Fu, J.  |  Zhao, C.

In the presented case study, an innovative design for an integrated CGC-DeC3 system introduces part of the heavier condensate from the early compression stages directly into the high-pressure (HP) depropanizer.

Enhance operation and reliability of dividing-wall columns

LG Chem, Ltd.: Lee, J. W.
Yeungnam University: Lee, M.
LG Chem.: Shin, J.
LG Chem Ltd.: Lee, S.
AMT Pacific Co. Ltd.: Lee, B.

Dividing wall columns (DWCs) are an attractive option when the goals are to reduce energy consumption and capital investment for distillation processes. A major component in a DWC system is the reflux..

Optimize vacuum ejector operations

Turkish Petroleum Refineries Corp. (Tüpraş): Temur, T.  |  Haktanir, M.  |  Uzman, F.  |  Karakaya, M.
Boğaziçi University: Avci, A. K.

Vacuum distillation unit (VDU) designs generally involve jet ejectors due to their low capital and operating expenses, high reliability, durability and simplicity. Once the ejector is installed and co..

Neste Oil to upgrade heaters at Porvoo refinery

As part of the investment, fired heaters at the refinery's crude distillation unit will be replaced with new-generation heaters, which Neste says will help ensure more consistent, incident-free operations at the site and yield annual energy savings worth an estimated €4 million.

Air Products to supply LNG heat exchangers for Petronas expansion project

Air Products' SplitMR liquefaction process and technology was selected and will be supplied to the Petronas LNG Train 9 Project. This project will produce 3.6 million tpy of LNG and is an expansion of the existing Petronas LNG complex in Bintulu, Sarawak, Malaysia. Financial terms were not disclosed.

North American olefin producers riding the shale gas wave

With the prospect of abundant low-cost ethane, several producers have announced intentions to build new ethylene capacity.

HP Boxscore Construction Analysis: Ethylene in evolution: 50 years of changing markets and economics

Hydrocarbon Processing Staff: Nichols, Lee

Ethylene is the key building block for the petrochemical industry. This olefin supports 70% of petrochemical industry production and is used to manufacture a wide variety of products for industrial an..

HP Viewpoint: Refiners have a new learning curve with shale oil

Baker Hughes: Marfone, P. A.

We’ve all heard the news reports: “Shale resource developments have the potential to make the US energy independent for the first time since 1952.” The long-term impact of shale resourc..