Gas to liquids (GTL)
LNG storage tanks: advancements in weld inspections
New inspection method improves jobsite examinations and verification of welds
Optimize energy integration for LNG terminals
Integrating heating requirements with adjacent facilities can provide economic bonus while improving operating efficiencies
Select the optimum extraction method for LNG regasification
Varying energy compositions of LNG imports may require terminal operators to remove C2+ compounds before injecting regasified LNG into pipelines
Design a turnkey floating LNG facility
Important factors to consider when planning an FPSO
Consider cryogenic methods to improve ammonia production
New technologies
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- TotalEnergies extends its fuel price cap policy in France until the end of April 4/7
- Navigating the montan wax challenge with renewable alternatives for polymers 4/7
- AFR selects Axens as technology provider for Texas (U.S.) refinery 4/7
- Iran has attacked Saudi Arabia's Jubail petrochemical complex, IRGC says 4/7
- Iran's Marvdasht Petrochemical complex attacked by US and Israel 4/7
- Fluor awarded engineering and design contract for America First Refining's refinery in South Texas 4/7
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

