Environment & Safety Gas Processing/LNG Maintenance & Reliability Petrochemicals Process Control Process Optimization Project Management Refining

Gas to liquids (GTL)

Natural gas and LNG trade - a global perspective

Chemical Engineering Dept., University of Houston: Economides, M. J.
Consultant: Mokhatab, S.
David Wood & Associates: Wood, D. A.

New dynamics within the gas industry will accelerate its ability to eclipse oil as the premier fuel of the world economy

Consider updates for gasification process

Sud-Chemie AG: Weishaupt, R.

Improvements for purification and CO conversion increase reliability of syngas process

Understanding LNG rapid phase transitions

ioMosaic Corp.: Melham, G. A.  |  Ozog, H
Exponent, Inc.: Saraf, S.

This basic knowledge can help mitigate potential hazards

North American LNG terminals: Options?

KBR: Caswell, C.  |  Durr, C.  |  Patel, H.

Several critical factors should be considered when designing receiving facilities

Improved regasification methods reduce emissions

Mustang Engineers, LP: Hubbard, B. S.  |  Worthington, W. S.

New technologies promote monetization of global LNG

LNG receiving and regasification terminal operations

Vopak LNG Holding BV: Lemmers, S. P. B.

Understanding and controlling boil-off gas pressure enhances energy efficiency

Consider barge-mounted plant to produce ultra-clean diesel

Syntroleum Corp.: Bigger, J. M.  |  Tomlinson, H. L.

New gas-to-liquids technologies enable constructing floating production units to develop stranded gas fields

LNG storage tanks: advancements in weld inspections

CB&I: Kruzic, R.

New inspection method improves jobsite examinations and verification of welds

Optimize energy integration for LNG terminals

Black & Veatch: Price, B. C.

Integrating heating requirements with adjacent facilities can provide economic bonus while improving operating efficiencies

Select the optimum extraction method for LNG regasification

KBR: Durr, C.  |  Cho, J.  |  Coyle D.
Chevron Energy Technology Co.: Huang, S.

Varying energy compositions of LNG imports may require terminal operators to remove C2+ compounds before injecting regasified LNG into pipelines