Equipment
World-class pipe-spool fabrication
Use these guidelines and checklist to evaluate a fabricator's ability to deliver the specified product on time
Successful closed-loop olefins plant optimization
Most of the important factors do not involve optimizer mechanics
Simple method determines flow regime for friction factor calculations
Use these criteria to avoid trial-anderror procedures
Current Digital Edition
![](/media/nkzcuz2h/hp-june-2024-process-optimization.jpg?width=100)
Sign up to Receive Our Newsletter
Latest News
- Methanex and Entropy partner to reduce emissions in methanol production 7/18
- Abraxas Power awards McDermott ECI contract for Canada's first green ammonia plant 7/18
- ClearSign Technologies to install 26 burners at U.S. Gulf Coast chemical facility 7/18
- CF Industries, POET to demonstrate use of low-carbon ammonia fertilizer to reduce carbon intensity of corn production and ethanol 7/18
- Evolution in the rapid, onsite detection of microbial contamination in diesel fuel 7/18
- U.S. crude stocks fall, gasoline and distillate inventories rise 7/18
- Digital Exclusive: SPECIAL FOCUS: Digital Technologies—Utilize process simulation digital twin to optimize condensate yield
- Digital Exclusive-Flare system design: Liquid pockets in flare headers
- Hydrogen-rich content gasoline: A new concept for paraffinic gasoline reformulation
- Alarm rationalization at Kuwait National Petroleum Company (KNPC) refineries
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction