Environment & Safety Gas Processing/LNG Maintenance & Reliability Petrochemicals Process Control Process Optimization Project Management Refining

Equipment

Meeting diesel specifications at sustained production

Shedded Uhde Pty Ltd.: Singh, D.

New approach rethinks operations of crude and vacuum distillation units to recover more distillate

Investigation: Failure of a surface condenser titanium tube

Saudi Basic Industries Corp.: Al-Meshari, A.
SABIC Technology Centre: Al-Enazi, S.  |  Diab, M.

Advanced analytic methods determine contributing factors in heat exchanger corrosion problem

HP Construction: Inauguration of the Ras Laffan Olefins Co. (RLOC) Cracker, Qatar

A joint venture between Qapco1 (63.63%), Total Petrochemicals France (36.36%) and QP (Qatar Petroleum)2 (0.01%) was established in June 2002 to implement the Qatofin project. This project includes participation in one of the world’s largest ethane crackers in Ras Laffan, a linear-low-density polyethylene (LLDPE) plant in Mesaiseed and the related ethylene pipeline linking both sites.

Shaw issues statement on events in Japan

"On behalf of all Shaw employees around the world, I give our deepest sympathy to the people of Japan. This is an extraordinary tragedy, and we can only imagine how painful and challenging this time is for everyone in the country," said J.M. Bernhard Jr., Shaw's chairman, president and chief executive officer.

Energy management toolkit available soon

The US Department of Energy’s Industrial Technologies Program (ITP) is in the process of developing the Energy Management Toolkit.

Foster Wheeler and consortium partners sign GES+ contract with Saudi Aramco

Foster Wheeler AG announced that a subsidiary of its Global Engineering and Construction Group together with the subsidiary’s consortium partners comprising A. Al-Saihati, A. Fattani & O. Al-Othman Consulting Engineering Co., (SOFCON) and Saudi Consolidated Engineering Company- Khatib & Alami (SCEC K&A) have signed a contract with Saudi Aramco for the provision of services associated with Saudi Aramco’s General Engineering Services Plus (GES+) initiative for a duration of five years with options available for extensions.

Improving pH control mitigates corrosion in crude units

Equipment and pipe failures can be avoided through better desalting practices and inhibitor injections

Avoid brittle fracture in pressure vessels

Chagalesh Consulting Engineers: Khazrai, F.  |  Haghighi, H. B.  |  Kordabadi, H.

Key points identify effects from auto-refrigeration on steel vessels

Process safety: Blind spots and red flags

Mustang Engineering Inc.: Shephard, T.

Improving safety for organizations involve more than technological solutions; understanding processes and plant interactions are a must

Case 61: Pressure loss in a reactor

Consulting Engineer: Sofronas, A.

Much information is available from a simple analysis