Environment & Safety
What is the optimum U.S. mogas sulfur content?
Simple algebraic optimization method provides the answer to this and other environmental and plant risk management questions
Improve estimations for dynamic pressure waves from an explosion
Using a polar coordinate system, engineers can estimate risks on buildings and structures during the design phase
Improve facility SIS performance and reliability
Use solenoids to partial stroke test block valves
Operator maintenance - key to reducing breakdowns
Here are the benefits and implementation procedures
Pregrouted baseplates reduce installation time and costs
Improving pump reliability is another benefit
Critical situation management – avoid the pitfalls
Guidelines are based on over 50 projects
Improving reliability of chemical processing facilities
An enterprise reliability management system offers powerful failure analysis capabilities
Include your field work force in the automation loop
New technologies reduce maintenance costs and increase productivity
Optimize FCC flue-gas emission control—Part 2
Regenerator design plays a crucial role when limiting NOx emissions
Risk-based approach to near miss
Here's a systematic process for first defining and then documenting incidents
Current Digital Edition
![](/media/1ychqec4/hp-july-2024-catalysts.jpg?width=100)
Sign up to Receive Our Newsletter
Latest News
- Clariant, OMV aim to reduce carbon footprint of ethylene and ethylene oxide derivatives 7/31
- Ampol, Graincorp collaborate for potential renewable fuels plant in Australia 7/31
- Brazil's JBS supplies animal waste for production of sustainable aviation fuel 7/31
- United is first airline to purchase SAF for O'Hare Int'l airport (Chicago, U.S.) 7/31
- Egypt aims to keep diesel prices subsidized 7/31
- illimity, Trafigura lend money to Italian refinery for energy transition 7/31
- Digital Exclusive: SPECIAL FOCUS: Digital Technologies—Utilize process simulation digital twin to optimize condensate yield
- Digital Exclusive-Flare system design: Liquid pockets in flare headers
- Hydrogen-rich content gasoline: A new concept for paraffinic gasoline reformulation
- Alarm rationalization at Kuwait National Petroleum Company (KNPC) refineries
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction