Mitra, S.
Control moisture problems in slurry-based polyolefin operations
Maintenance & Reliability
/ Petrochemicals
/ Process Optimization
/ Americas
/ Asia/Pacific
/ Catalysts
/ Construction
/ Corrosion
/ Drying
/ Economics
/ Engineering & Design
/ Equipment
/ Europe
/ Middle East
/ Polymers
/ Pumps
/ Reactors
/ Rotating Equipment
/ Valves
Proper moisture removal from the polymerization-reaction medium is key to successfully operating a HDPE plant designed on low-pressure, slurry-process technology.
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- Digital Feature: Utilizing steam stripping to remove benzene from wastewater and waste streams: A guide to maintaining compliant benzene levels with confidence 4/15
- OQ, Royal Vopak partner to accelerate development of Duqm as an integrated industrial hub 4/15
- Samsung E&A awarded contract for polylactic acid plant in the UAE 4/15
- Kuwait commences merger of state oil firms KNPC and KIPIC 4/15
- Russia well prepared for refinery maintenances with high fuel stockpiles 4/15
- Japan's Fuji Oil restarts 143,000-bpd Sodegaura CDU after fire 4/15
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction