O'Malley, C.
Colemann O'Malley is a Manager with T.A. Cook. He is a reliability professional, with extensive experience in asset management, risk assessment and implementation of reliability projects in the oil and gas industry. As an electrical engineer with several years of field experience in the refining and chemicals industries, Mr. O’Malley is piloting the implementation and development of digital solutions in asset management.
Safety and environmental benefits of reliability engineering
Environment & Safety
/ Refining
/ Boilers
/ Carbon Management
/ Distillation
/ Environment
/ Equipment
/ Loss Prevention
/ Motors
/ People
/ Rotating Equipment
/ Safety
/ Turbines
/ Utilities
/ Valves
/ Americas
When you boil down the mission of reliability to its bare essence, the job is to deliver maximum operational availability for the least amount of money over the lifecycle of the asset.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Essar launches hydrogen power plant at Stanlow refinery (U.K.) 7/16
- Trelleborg partners with Airbus on hydrogen-powered air travel 7/16
- Neste, Mitsubishi Corporation agree on strategic partnership to develop supply chains for renewable chemicals and plastics 7/16
- Vale, Komatsu and Cummins announce collaboration to develop dual-fuel large trucks, powered by ethanol and diesel 7/16
- Mexico–U.S. energy trade value fell in 2023 on lower fuel prices 7/16
- Belarus' Mozyr oil refinery restoring operations after outage due to storm 7/16
- Digital Exclusive: SPECIAL FOCUS: Digital Technologies—Utilize process simulation digital twin to optimize condensate yield
- Digital Exclusive-Flare system design: Liquid pockets in flare headers
- Hydrogen-rich content gasoline: A new concept for paraffinic gasoline reformulation
- Alarm rationalization at Kuwait National Petroleum Company (KNPC) refineries
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction