Knudsen, P. U.
studied chemical engineering at the Technical University of Denmark. He has worked in scheduling, planning and economics at different refineries for more than 25 years. He has worked at Kuwait Petroleum and Shell, and he now has a position as an advisor in planning and economics at Statoil, in a group that is dedicated to crude optimization and crude risk assessment. He holds an MS degree in chemical engineering.
Improve refinery margins with new crude selection concept
Petrochemicals
/ Process Control
/ Refining
/ Americas
/ Asia/Pacific
/ Crude oil
/ Europe
/ Information Systems
/ Management
/ Middle East
/ Naphtha
A refinery with an active crude selection strategy encompassing dedicated staff, preapproval of all new crudes and an updated crude acceptance window can gain $0.5/bbl–$1/bbl vs. a more passive strategy.
- 1
- ... 1 pages
Current Digital Edition
![](/media/nkzcuz2h/hp-june-2024-process-optimization.jpg?width=100)
Sign up to Receive Our Newsletter
Latest News
- Essar launches hydrogen power plant at Stanlow refinery (U.K.) 7/16
- Trelleborg partners with Airbus on hydrogen-powered air travel 7/16
- Neste, Mitsubishi Corporation agree on strategic partnership to develop supply chains for renewable chemicals and plastics 7/16
- Vale, Komatsu and Cummins announce collaboration to develop dual-fuel large trucks, powered by ethanol and diesel 7/16
- Mexico–U.S. energy trade value fell in 2023 on lower fuel prices 7/16
- Belarus' Mozyr oil refinery restoring operations after outage due to storm 7/16
- Digital Exclusive: SPECIAL FOCUS: Digital Technologies—Utilize process simulation digital twin to optimize condensate yield
- Digital Exclusive-Flare system design: Liquid pockets in flare headers
- Hydrogen-rich content gasoline: A new concept for paraffinic gasoline reformulation
- Alarm rationalization at Kuwait National Petroleum Company (KNPC) refineries
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction