Mulrooney, M.
Mike Mulrooney is the project and design services manager at ShureLine Construction. In addition, he serves as the quality control manger of piping fabrications. Prior to joining ShureLine in 2000, Mr. Mulrooney was an engineering designer for DuPont, assigned to plant capital projects. With more than 28 years of experience, he specializes in the design of piping systems for various industrial applications and chemical processes. He holds a BS degree in engineering from Widener University.
Modularization: The key to success in today’s market
Process Control
/ Project Management
/ Refining
/ Construction
/ Economics
/ Engineering & Design
/ Equipment
/ Management
The world economic order is rapidly changing. A transition is underway, led by the sudden collapse of crude oil and natural gas prices. Here, the pros and cons of modularization vs. field construction are outlined.
- 1
- ... 1 pages
Current Digital Edition
![](/media/nkzcuz2h/hp-june-2024-process-optimization.jpg?width=100)
Sign up to Receive Our Newsletter
Latest News
- Essar launches hydrogen power plant at Stanlow refinery (U.K.) 7/16
- Trelleborg partners with Airbus on hydrogen-powered air travel 7/16
- Neste, Mitsubishi Corporation agree on strategic partnership to develop supply chains for renewable chemicals and plastics 7/16
- Vale, Komatsu and Cummins announce collaboration to develop dual-fuel large trucks, powered by ethanol and diesel 7/16
- Mexico–U.S. energy trade value fell in 2023 on lower fuel prices 7/16
- Belarus' Mozyr oil refinery restoring operations after outage due to storm 7/16
- Digital Exclusive: SPECIAL FOCUS: Digital Technologies—Utilize process simulation digital twin to optimize condensate yield
- Digital Exclusive-Flare system design: Liquid pockets in flare headers
- Hydrogen-rich content gasoline: A new concept for paraffinic gasoline reformulation
- Alarm rationalization at Kuwait National Petroleum Company (KNPC) refineries
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction