Jadav, N.
Nikul Jadav is a Consultant Piping Engineer for the Tanajib Gas Plant Projects, part of Saudi Aramco’s Marjan Development Program. He has worked over the last 20 yr across diverse projects and clients within the oil and gas sector, with a key focus on plant layout, piping design and engineering. Mr. Jadav holds an MS degree in project management from The University of Liverpool, U.K.
Piping interface type selection
Most oil and gas process plant projects involve multiple work packages executed by different lump sum turnkey (LSTK) contractors executing work within their own package, with a final piping interface connection at an agreed boundary limit to accomplish the interface joint between two parties and successfully close the piping interface.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Brazil's Petrobras approves $1.2 billion investment for renewable fuels plant 6/22
- First batch of equipment arrives in Kazakhstan for $7.7-B Atyrau polyethylene project 6/22
- Explosion at Qatar's Ras Laffan LNG complex kills 13, injures 66 6/22
- Asia has plenty of crude oil, but refined fuels remain tight 6/22
- Fire extinguished at Marathon's Galveston Bay Refinery in Texas (U.S.) 6/22
- El Nino, expanding ethanol use squeeze India sugar supply 6/22
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction