Alshahrani, Y.
Yasser Alshahrani is a Pump Engineer at Saudi Aramco. He has 7 yr of rotating equipment experience and is a Certified Vibration Analyst: ISO Category II. Alshahrani earned a BS degree in mechanical engineering and an MS degree in engineering management from King Fahad University of Petroleum and Minerals.
Hot oil pump warm-up system best practices and failure case study
Many industries utilize pumps in hot applications, including oil and gas facilities.
Pump recycle line optimization and energy savings
The objective of this article is to demonstrate the benefits of optimizing the pumping system through pump recycle line evaluations.
Use infrared thermal imaging for pump system condition monitoring and early failure detection
Thermal imaging technology has evolved over the years, and investment costs have decreased significantly.
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- Evonik presents innovative "Debonding on Demand" concept for more sustainable bonding 4/3
- Oil, gas and refined product imports exempted from Trump’s sweeping tariffs 4/3
- Reliance: India's gasoline demand to peak by 2035, diesel by 2041 4/3
- Mabanaft, HIF Global sign agreement to accelerate e-methanol adoption in the shipping industry 4/3
- Burckhardt Compression awarded digital monitoring services contract for a chemical plant in Saudi Arabia 4/3
- Lummus completes successful startup of electric heater demonstration unit 4/3
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction