Al-Jabran, A.
Ali A. Al-Jabran is a Senior Digital System Technician at Saudi Aramco’s R&DC. He has more than 30 yr of experience in high-temperature and high-pressure oilfield corrosion, including kinetic hydrate inhibitor development, downhole acidization and pipeline corrosion inhibitor selection.
- ... 0 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Petrovietnam says supertanker with Iraqi oil arrives at refinery port 6/1
- Russia bans aviation fuel exports until November 30 6/1
- Green Fuels Operating breaks ground on $400-MM refinery in Oklahoma (U.S.) 6/1
- SABIC puts 141 lots of industrial assets up for public auction 6/1
- Digital Exclusive: Margin left on the table: The hidden cost of supply chain capability gaps in hydrocarbon processing—Part 1 6/1
- bp sells 5% stake in Australian Browse LNG project to South Korea's GS Energy 6/1
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

