Al-Enazi, S.
Mitigate reactor failures due to graphitization
Environment & Safety
/ Maintenance & Reliability
/ Process Optimization
/ Americas
/ Asia/Pacific
/ Construction
/ Corrosion
/ Economics
/ Engineering & Design
/ Equipment
/ Europe
/ Loss Prevention
/ Management
/ Middle East
/ Reactors
/ Safety
Graphitization occurs in carbon steel (CS) reactors in high-temperature service (> 455°C). As discussed in this case history, the shell of a methyl tertiary butyl ether (MTBE) reactor became s..
Investigation: Failure of a surface condenser titanium tube
Maintenance & Reliability
/ Petrochemicals
/ Process Optimization
/ Americas
/ Asia/Pacific
/ Construction
/ Corrosion
/ Economics
/ Engineering & Design
/ Equipment
/ Europe
/ Heat Transfer
/ Middle East
/ Piping
Advanced analytic methods determine contributing factors in heat exchanger corrosion problem
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- ExxonMobil plans 1 Blbs/yr of advanced recycling by 2027 11/22
- Gauging the likely Trump effect on U.S. energy and power sectors 11/22
- Russia's Lukoil restoring cracker at NORSI refinery, gasoline output rising 11/22
- Nigeria's local currency crude sales fall short of target, Dangote refinery says 11/22
- U.S. October gasoline imports hit post-pandemic low on slump in European shipments 11/22
- Clean Hydrogen Works awards McDermott FEED contract for Ascension Clean Energy (ACE) project 11/21
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction