Nyadong, L.
is a Senior Scientist in Phillips 66’s Energy Research and Innovation (ERI) organization. He has more than 10 yr of experience in the petroleum industry, developing and implementing advanced analytical methods to support Phillips 66’s ERI and worldwide organizations. He earned a BS degree in chemistry and materials science technology from the University of Buea in Cameroon, an MS degree in biochemistry from the University of Toledo in Ohio, and a PhD in analytical chemistry from the Georgia Institute of Technology in Atlanta.
Investigation and diagnosis of startup foaming issues at a new tail gas treater
Environment & Safety
/ Maintenance & Reliability
/ Process Optimization
/ Refining
/ Acid Gas Removal
/ Boilers
/ Catalysts
/ Distillation
/ Engineering & Design
/ Environment
/ Equipment
/ Loss Prevention
/ Naphtha
/ Piping
/ Products
/ Reactors
/ Sulfur
/ Treating
/ Americas
In May 2021, Phillips 66 started up a new methyl diethanolamine (MDEA)-based tail gas unit at its Belle Chasse, Louisiana, refinery.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Brazil's Petrobras approves $1.2 billion investment for renewable fuels plant 6/22
- First batch of equipment arrives in Kazakhstan for $7.7-B Atyrau polyethylene project 6/22
- Explosion at Qatar's Ras Laffan LNG complex kills 13, injures 66 6/22
- Asia has plenty of crude oil, but refined fuels remain tight 6/22
- Fire extinguished at Marathon's Galveston Bay Refinery in Texas (U.S.) 6/22
- El Nino, expanding ethanol use squeeze India sugar supply 6/22
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

