Copper, S.
is a Process Engineer with Phillips 66, working with crude and vacuum distillation, saturate gas distillation and diesel hydrotreating. Mr. Copper has spent most of his career focused on operations engineering, but also has experience in process design, energy conservation and capital project startup support. He earned a BS degree in chemical engineering from Tulane University in New Orleans, Louisiana.
Investigation and diagnosis of startup foaming issues at a new tail gas treater
Environment & Safety
/ Maintenance & Reliability
/ Process Optimization
/ Refining
/ Acid Gas Removal
/ Boilers
/ Catalysts
/ Distillation
/ Engineering & Design
/ Environment
/ Equipment
/ Loss Prevention
/ Naphtha
/ Piping
/ Products
/ Reactors
/ Sulfur
/ Treating
/ Americas
In May 2021, Phillips 66 started up a new methyl diethanolamine (MDEA)-based tail gas unit at its Belle Chasse, Louisiana, refinery.
- 1
- ... 1 pages
Current Digital Edition
![](/media/nkzcuz2h/hp-june-2024-process-optimization.jpg?width=100)
Sign up to Receive Our Newsletter
Latest News
- Essar launches hydrogen power plant at Stanlow refinery (U.K.) 7/16
- Trelleborg partners with Airbus on hydrogen-powered air travel 7/16
- Neste, Mitsubishi Corporation agree on strategic partnership to develop supply chains for renewable chemicals and plastics 7/16
- Vale, Komatsu and Cummins announce collaboration to develop dual-fuel large trucks, powered by ethanol and diesel 7/16
- Mexico–U.S. energy trade value fell in 2023 on lower fuel prices 7/16
- Belarus' Mozyr oil refinery restoring operations after outage due to storm 7/16
- Digital Exclusive: SPECIAL FOCUS: Digital Technologies—Utilize process simulation digital twin to optimize condensate yield
- Digital Exclusive-Flare system design: Liquid pockets in flare headers
- Hydrogen-rich content gasoline: A new concept for paraffinic gasoline reformulation
- Alarm rationalization at Kuwait National Petroleum Company (KNPC) refineries
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction