Mosir, M.
Marina Mosir has more than 15 yr of work experiences in the refining and natural gas/LNG industry as a Process Engineer, Lead Process Engineer and Engineering Manager for various Petronas operating units and capital projects. She is a mass transfer design expert within Petronas, with more than 12 yr of experience in revamping, troubleshooting and designing distillation columns and separators.
Optimizing for viability—VDU revamp in a brownfield project
Process Optimization
/ Refining
/ Distillation
/ Economics
/ Engineering & Design
/ Heat Transfer
/ Loss Prevention
/ Asia/Pacific
Revamping an existing column in an operating plant for higher throughput is a challenge, especially when the column is already operating at its rated capacity.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Valero Energy Q4 profit beats estimates; shares surge 1/30
- Dow launches "Transform to Outperform" to raise the competitive industry benchmark for productivity and growth to enable improved returns 1/30
- Russian oil refineries' peak maintenance expected in January and September 1/30
- U.S. lifts some Venezuela sanctions to ease oil sales 1/30
- Keppel, Aster plan sustainable aviation fuel project in Singapore 1/30
- Boeing, Israel's Technion to develop sustainable aviation fuel, as sector grapples with 2050 goal 1/30
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

