Tsang, R.
Raymond Tsang is the Process Engineering Manager at Koch-Glitsch, UK. He has more than 30 yr of experience in the design of fractionation equipment. Mr. Tsang earned a BS degree in chemical engineering from the University of Newcastle upon Tyne in the UK.
Good distributor design for high-velocity feed debottlenecks a crude preflash tower
Environment & Safety
/ Maintenance & Reliability
/ Process Optimization
/ Refining
/ Construction
/ Crude oil
/ Distillation
/ Engineering & Design
/ Environment
/ Equipment
/ Loss Prevention
/ Naphtha
/ Piping
/ Pumps
/ Europe
Bazan Group’s crude unit No. 3—not designed by any of the authors’ companies—was bottlenecked by the preflash tower.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Pakistan-China to sign MoU on oil-to-chemicals complex in June 5/17
- China biofuel makers bet on sustainable aviation fuel 5/17
- AMETEK Land provides thermal imagers to large ethylene producer 5/17
- China's refinery output falls for first time in 20 mos due to maintenance 5/17
- Dow, SCG Chemicals sign MoU to transform 200,000 tpy of plastic waste into circular products 5/17
- Ukraine long-range attacks continue to disrupt Russian refining, energy operations 5/17
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction