Dokhkan, A.
works in the Petroleum Refinery of Jordan as the section head of the refinery process unit’s development. He is also responsible for the refinery’s process safety projects and studies. Mr. Dokhkan has worked for over 12 years in oil refining processes and technical safety, and he is a certified functional safety professional (CFSP) and a certified occupational safety practitioner.
Prevent the overfilling of storage tanks
Overfilling storage tanks, especially those with large inventories of toxic or flammable material, has always been a safety concern for site owners and operators.
Estimate equilibrium flash vaporization curves accurately
A computer program simplifies methods of true boiling point curves in design applications
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Malaysia plans to produce sustainable jet fuel in 2027 11/27
- ADNOC launches $80-B low-carbon energy and chemicals investment company 11/27
- Chevron sees California's fuel inventory law raising prices for customers 11/27
- Clariant’s MegaMax™ catalysts to power China’s first biomass-to-green methanol project 11/27
- easyJet, Renavia and WFS sign MoU for long-term supply of SAF 11/27
- Cyclyx to invest in second Cyclyx Circularity Center 11/27
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction