Stavrakas, D.
Use dynamic simulation for advanced LNG plant design
Gas Processing/LNG
/ Process Optimization
/ Americas
/ Asia/Pacific
/ Engineering & Design
/ Europe
/ Gasification
/ Middle East
/ Natural Gas
The work performed for the project shows that dynamic simulation can be an excellent tool for the support and verification of process design during the engineering, procurement and plant construction (EPC) stages.
Optimize training using a high-fidelity simulator
Here are lessons learned from a Russian methanol plant
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Shipping major and GCMD to pilot FAME-VLSFO marine biofuel bunker fuel in Singapore 5/9
- Diesel profit margins decline amid lower demand, more capacity 5/9
- World Energy and Boston Consulting Group sign agreement on SAF certificates 5/9
- Analysis: Chandra Asri purchase of Shell Singapore refinery brings scale, risk 5/9
- New $1.5-B natural gas pipeline to provide feedstock to Dow's petrochemicals plant and other industrial facilities 5/8
- Shell to sell interest in Singapore Energy and Chemicals Park to CAPGC 5/8
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction