Ramachandrarao, B.
B. Ramachandrarao is a General Manager at Hindustan Petroleum’s Green R&D Center in Bengaluru, India. He has 30 yr of experience in various areas of petroleum refining, such as operations, commissioning, process engineering and technology development. He is responsible for the development and commercialization of various products and processes. Mr. Ramachandrarao holds an MTech degree in chemical engineering and an MBA degree. He is pursuing a PhD from the University of Petroleum and Energy Studies at Dehradun. He has more than 15 patents to his credit.
Maximize FCC product yields with a specialty catalyst formulation
Fluid catalytic cracking (FCC) is one of the most important conversion processes used in petroleum refineries and has been in use for more than 75 yr.
- 1
- ... 1 pages
Current Digital Edition
![](/media/nkzcuz2h/hp-june-2024-process-optimization.jpg?width=100)
Sign up to Receive Our Newsletter
Latest News
- Essar launches hydrogen power plant at Stanlow refinery (U.K.) 7/16
- Trelleborg partners with Airbus on hydrogen-powered air travel 7/16
- Neste, Mitsubishi Corporation agree on strategic partnership to develop supply chains for renewable chemicals and plastics 7/16
- Vale, Komatsu and Cummins announce collaboration to develop dual-fuel large trucks, powered by ethanol and diesel 7/16
- Mexico–U.S. energy trade value fell in 2023 on lower fuel prices 7/16
- Belarus' Mozyr oil refinery restoring operations after outage due to storm 7/16
- Digital Exclusive: SPECIAL FOCUS: Digital Technologies—Utilize process simulation digital twin to optimize condensate yield
- Digital Exclusive-Flare system design: Liquid pockets in flare headers
- Hydrogen-rich content gasoline: A new concept for paraffinic gasoline reformulation
- Alarm rationalization at Kuwait National Petroleum Company (KNPC) refineries
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction