Yahyaabadi, R.
Consider practical conditions for vacuum unit modeling
A good simulation model is a tool that reveals critical operating conditions and can be applied to daily operations
Improve design strategies for refinery vacuum towers
Products yield and specifications with energy conservation goals can determine options to revamp distillation units
Increase distillation capacity with side heaters and coolers
Debottlenecking towers involves close review of product yields while reducing tray flooding and energy consumption
Rethink placement of preflash drum in crude preheat train network
Strategic location of the preflash drum not only resolves network problems, but, in some cases, reduces operating costs
Solving hydraulic problems in crude preheat train networks
Heat transfer and hydraulic problems need to be considered simultaneously
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Aether Fuels and FlyORO sign MoU to explore integrated SAF supply-chain and blending solutions for Project Beacon and future Aether projects 5/12
- Hapag-Lloyd and Kuehne+Nagel to collaborate on lowering emissions in shipping via sustainable marine fuels 5/12
- Jordan commits $1 B to launch first green ammonia export hub in Aqaba 5/12
- Cognite introduces fully integrated, AI-native industrial experience 5/12
- Hengli Petrochemical's former Singapore unit to cease operations 5/12
- Mitsubishi Chemical to withdraw from polybutylene succinate business at PTT MCC Biochem 5/12
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

