Bonkat, T.
Timchan Bonkat is a Global Temperature Product Manager for Emerson’s Automation Solutions business in Shakopee, Minnesota, with responsibility for Rosemount sensors and thermowells. He earned a BS degree in electrical engineering from St. Cloud State University.
Key instrumentation technologies to tackle the toughest measurement challenges
Environment & Safety
/ Maintenance & Reliability
/ Petrochemicals
/ Process Control
/ Process Optimization
/ Refining
/ Analyzers
/ Carbon Management
/ Economics
/ Engineering & Design
/ Environment
/ Equipment
/ Information Systems
/ Natural Gas
/ Reactors
/ Rotating Equipment
/ Safety
/ Utilities
/ Valves
Just as some people seek out extreme sports, process manufacturing has its extreme applications, and engineers who design for these environments must find ways to safely contain and monitor all manner of dangerous reactions and products.
- 1
- ... 1 pages
Current Digital Edition
![](/media/nkzcuz2h/hp-june-2024-process-optimization.jpg?width=100)
Sign up to Receive Our Newsletter
Latest News
- Essar launches hydrogen power plant at Stanlow refinery (U.K.) 7/16
- Trelleborg partners with Airbus on hydrogen-powered air travel 7/16
- Neste, Mitsubishi Corporation agree on strategic partnership to develop supply chains for renewable chemicals and plastics 7/16
- Vale, Komatsu and Cummins announce collaboration to develop dual-fuel large trucks, powered by ethanol and diesel 7/16
- Mexico–U.S. energy trade value fell in 2023 on lower fuel prices 7/16
- Belarus' Mozyr oil refinery restoring operations after outage due to storm 7/16
- Digital Exclusive: SPECIAL FOCUS: Digital Technologies—Utilize process simulation digital twin to optimize condensate yield
- Digital Exclusive-Flare system design: Liquid pockets in flare headers
- Hydrogen-rich content gasoline: A new concept for paraffinic gasoline reformulation
- Alarm rationalization at Kuwait National Petroleum Company (KNPC) refineries
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction