Jordan, S.
Stephen Jordan has more than 50 yr of experience for several large international companies as a senior-level engineering, design, projects, commissioning, plant startup and data analysis for 13 processes, including coal gasification, fluid bed and solid processes, and chemical production. He has managed or supported grassroot startups for several domestic and international projects. He has extensive experience with the operation of small- to large-scale pilot plants, first commercial plants, as well as laboratories, manufacturing, engineering, R&D, and acting as an expert witness.
Diagnostics tools and techniques for large-scale operating fluidized beds
Intrusive and non-intrusive diagnostic tools and techniques for fluidized bed reactors are discussed here, with a focus on chemical synthesis catalytic reactions.
- 1
- ... 1 pages
Current Digital Edition
![](/media/nkzcuz2h/hp-june-2024-process-optimization.jpg?width=100)
Sign up to Receive Our Newsletter
Latest News
- Essar launches hydrogen power plant at Stanlow refinery (U.K.) 7/16
- Trelleborg partners with Airbus on hydrogen-powered air travel 7/16
- Neste, Mitsubishi Corporation agree on strategic partnership to develop supply chains for renewable chemicals and plastics 7/16
- Vale, Komatsu and Cummins announce collaboration to develop dual-fuel large trucks, powered by ethanol and diesel 7/16
- Mexico–U.S. energy trade value fell in 2023 on lower fuel prices 7/16
- Belarus' Mozyr oil refinery restoring operations after outage due to storm 7/16
- Digital Exclusive: SPECIAL FOCUS: Digital Technologies—Utilize process simulation digital twin to optimize condensate yield
- Digital Exclusive-Flare system design: Liquid pockets in flare headers
- Hydrogen-rich content gasoline: A new concept for paraffinic gasoline reformulation
- Alarm rationalization at Kuwait National Petroleum Company (KNPC) refineries
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction