Shah, G. C.
G. C. Shah is a Consultant specializing in process safety, environmental management, plant operations and training. He is involved in HAZOP, LOPA and SIL assessments, accident investigations, plant audits and operations troubleshooting, fire risk assessment, and safety, environmental and industrial hygiene management.
Tips to avoid pitfalls in CO2 capture projects
Environment & Safety
/ Gas Processing/LNG
/ Process Optimization
/ Project Management
/ Refining
/ Biofuels
/ Carbon Management
/ Construction
/ Corrosion
/ Economics
/ Engineering & Design
/ Environment
/ Equipment
/ Greenhouse Gases
/ Products
In recent years, growing concern about increasing atmospheric carbon dioxide (CO<sub>2<sub/>) levels has put mounting pressure on governments and on processing industries to curb carbon emissions.
- 1
- ... 1 pages
Current Digital Edition
![](/media/nkzcuz2h/hp-june-2024-process-optimization.jpg?width=100)
Sign up to Receive Our Newsletter
Latest News
- Essar launches hydrogen power plant at Stanlow refinery (U.K.) 7/16
- Trelleborg partners with Airbus on hydrogen-powered air travel 7/16
- Neste, Mitsubishi Corporation agree on strategic partnership to develop supply chains for renewable chemicals and plastics 7/16
- Vale, Komatsu and Cummins announce collaboration to develop dual-fuel large trucks, powered by ethanol and diesel 7/16
- Mexico–U.S. energy trade value fell in 2023 on lower fuel prices 7/16
- Belarus' Mozyr oil refinery restoring operations after outage due to storm 7/16
- Digital Exclusive: SPECIAL FOCUS: Digital Technologies—Utilize process simulation digital twin to optimize condensate yield
- Digital Exclusive-Flare system design: Liquid pockets in flare headers
- Hydrogen-rich content gasoline: A new concept for paraffinic gasoline reformulation
- Alarm rationalization at Kuwait National Petroleum Company (KNPC) refineries
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction